TECHNOLOGY OVERVIEW
Lot Tolerance Percent Defectives (LTPD) with Rectification Double Sampling Plan
BIS.Net Team
For a double sampling plans you take a first sample consisting of n items and each item is checked to see if it is defective. The number of defective items is then counted and compared with the first sample acceptance value for the sampling plan. If the number of defectives is less or equal to the first sample acceptance value the batch is rejected. If it exceeds the SECOND sample acceptance value the batch is rejected. If the number of defectives of the first sample are more than the first sample acceptance value and less or equal to the resample value the batch is resampled. If the total number of defectives of BOTH samples exceeds the second sample acceptance value the batch is rejected and accepted otherwise
This type of sampling plan is normally used on batches, or lots prior, to shipping to a customer ensuring that the outgoing quality matches the specified level for customer acceptance. Several samples are taken randomly, and the number of defectives counted. If the number of defectives exceed a certain number for that sample size the batch is rejected, and 100 percent inspection carried out. Defective items are then removed and replaced with good items ensuring.
The output includes an OC curve and the plan